Bullhead City staff, City contractors, and utility companies within city limits will work on the following projects during the week of July 13:
• The City will pave the portion of the removed raised median along Meadows Dr.
• Premiere Backhoe, on behalf of Bullhead City Utilities, will continue work to install a new manhole, rehabilitate an existing manhole, and replace 80 feet of sewer main along Lakeside Dr between the entrance of the Smiths parking lot and Riviera Blvd. Traffic is reduced to one lane in each direction through the area as crews work in the southbound lanes of the road. Access to Lakeside Dr from Coral Isle Dr will be closed. Residents on Coral Isle Dr will need to detour to Surf Spray Dr until work is completed.
• Perco Rock Company, on behalf of the City, will continue working along Highway 95 between Georgia Lane and E Shore Villas Drive. Crews are working overnight from 6 p.m. to 6 a.m. Monday – Friday. Crews will be making drainage improvements, completing improvements to the access points to the highway from adjoining businesses, and finalizing punch list items. Highway 95 access to the parking lot of the business plaza between Plata Dr and Colina Dr will be closed this week while work is ongoing. Motorists will be able to access the plaza from Plata Dr and Colina Dr. Throughout the project, the speed limit through the area is reduced to 30 mph for the safety of motorists and construction crew members. Please drive accordingly.
• T.R. Orr, Inc., on behalf of the City of Bullhead City, will continue building new restrooms at Community Park, just south of the Bullhead Belle.
• McCormick Construction will continue work to pave the southbound right-hand turn lane of Highway 95 into the future City Centre development between Marina Blvd and Riverview Dr. Work on the turn lane will take place overnight on weekdays.
• Gold Rush Rd, from Silver Creek Rd to Black Mountain Rd, and Black Mountain Rd, from Gold Rush Rd to Acacia Way, will be periodically closed to through traffic while contractors upgrade the existing gas main in the right of way. Residents living along the closure will still have access to their property.
• The eastbound lane of Silvercreek Rd will be closed at the intersection of Gold Rush Rd, with traffic diverted into the median for multiple weeks while contractors upgrade the existing gas main in the right of way.
• Contractors working on behalf of Bullhead City Utilities will complete various asphalt and concrete repairs around the City in places where recent water line repairs were made.
• Kay Constructors LLC, under contract with Bullhead City Utilities, is building a new aeration basin at the Section 10 wastewater treatment plant. The project is part of an overall expansion effort to increase the volume of water the City can reclaim.
• Bullhead City Utilities will rehabilitate a Clarifier at the Section 10 wastewater treatment plant. The project will involve draining, cleaning, and measuring the clarifier before installing new mechanical equipment and protective material to extend the lifespan of the concrete.
Be the first to receive road closure notices and other timely project updates with the Bullhead City Direct app, available for Android and IOS devices. The app is the public’s direct line to City Hall, providing timely updates and the ability to report issues around the city directly to City Staff for resolution. Visit bullheadcity.com/BullheadCityDirect for more information.
The City reminds the public to only flush human waste, toilet paper, and grey water down the drain. All other waste products should be disposed of through other means to avoid damage to the City’s infrastructure.
Please use caution while traveling through City work zones. Obey posted signage and traffic control devices.
Questions about ongoing projects throughout the City can be directed to the Public Information Office.
FOR IMMEDIATE RELEASE October 22, 2026 Mohave County Supervisor Rich Lettman today issued a statement regarding the...
FOR IMMEDIATE RELEASE October 22, 2026 New ADA Parking and Complimentary Paratransit Shuttle Service for Laughlin...
FOR IMMEDIATE RELEASE October 22, 2026 Kingman, AZ – The 20th Annual Walk Away from Drugs has been rescheduled for...
0 Comments